The project encompassed planning, designing, construction and operation of the public sewerage system in Puding. The scope of work included the construction of the sewerage network, a sewage treatment plant, a water recycling center, public pipelines and a household plumbing system.
- Population served: 46,000 personsa
- Length of wastewater pipelines: 38,950 meters
- Numbers of household connection-pipes: 10,982
- Wastewater treatment capacity: 15,000 CMD
Concession Period
35 years from October 2016