Project
Tainan Chengxi Incineration Plant BOT Project
Type
Promotion of Private Participation
Business category
Waste and Renewable Energy
Location
Tainan, Annan Dist
Introduction

Chengxi Incineration Plant has been in operation for more than 20 years. The original design for the capacity is 900 metric tons per day. After many years’ operation, it can handle 600 metric tons of garbage per day only. Therefore, the department of Environmental Protection Bureau has chosen the east side of Chengxi to plan and build a new generation of waste incineration plant. In addition, the superwater park will be revitalize and renovate.

Features
  1. The most highest power generation efficiency of 25% in Taiwan, waste treatment capacity of 900 metric tons per day (annual processing capacity of 295,650 metric tons)
  2. The strictest air pollution discharge standard in the country: voluntarily promise to limit the emission of nitrogen oxides to less than 30ppm and the limit of hydrogen chloride to less than 3ppm
  3. The first waste recycling education park in Taiwan.
Completion Time

The end of 2025