Project
Sludge Drying, Fengshan River Wastewater Reclamation Project
Project Model
EPC
Category
Waste treatment and renewable energy
Location
Fengshan River, Kaohsiung City
Details

The Fengshan River sewage treatment plant has a sludge drying system with an hourly processing capacity of 700 kg and a water extraction capacity of up to 500 kg. After drying, the water content in the sludge is reduced from 80% to 15%, which in turn lowers the cost in sludge treatment.

Highlights

Drying method: hot air drying

Power source: biogas

Energy efficiency: 0.9 KW/kg.H2O

Simple and safe operation: continuous feed

System stability: smart logical system, fully automated

Time of Completion

2018